Home » Saraji Mine Pontoon System
Principal
Location
Value
Description
Design and construct 40m long aluminium gangway, landing pontoon, multi-directional pivot brackets, cable brace connection system and all other componentry. Project design considered road transport and site access constraints. Fabrication and installation methodology developed specifically for site to provide safe construction.
SCOPE/AREA OF BUSINESS
Scope / Areas of Business