Home » Brisbane International Cruise Terminal Gangways
Principal
Location
Value
Description
Marine Structures successfully completed the design, fabrication, and installation of 12 x 20-metre access gangways as part of a major marine infrastructure upgrade. The gangways are supported by eight newly installed Denso-wrapped piles, along with four custom-engineered cantilever landing frames fixed to existing mooring dolphins.
The project also included the integration of solar-powered lighting, secure access gates, and provisions for future cathodic protection, ensuring long-term durability and safety.
SCOPE/AREA OF BUSINESS
Scope / Areas of Business